Overlooks final touches and lacks knowledge:
Measured for baseboard and added 10% both for materials and labor. I think only materials cost should be added in case of shortage. 10% for labor is giving yourself a tip. Also, had to call them back to finish caulking around the edges. I should not be the one to check up on the workers.
Hardwood was refinished and a bunch of scratches and bubbles were left. Also, did not tell us to stay off the floor during the drying. The guy even walked on the floor himself and then charged us extra to remove the footprints. He denied that he was the one that walked on the floor. After 1 year, the finish is wearing down already. 3 coats my butt.
by Sam on February 17, 2008