Becker Corp Builders

79 Orange Ave SuffernNY10901
Closed
Sunday
Closed
Monday
8:00am-4:00pm
Tuesday
8:00am-4:00pm
Wednesday
8:00am-4:00pm
Thursday
8:00am-4:00pm
Friday
8:00am-4:00pm
Saturday
Closed
Payment Methods: Visa, MasterCard, American Express, Check, Debit
Average Rating
3
Total Reviews
(4)
Recommended 0
Not Recommended 0
Map

Open Map

Description

Becker Corp Builders was founded in 2002. Becker Corp Builders specializes in Commercial And Office Building Contractors.
by dandb on July 21, 2015 from dandb

Member Reviews

Finally a reliable contractor!:
I could be writing a hole book with nothing but high recommendations for Becker Corp Builders, I have been using this company for the last five years and I have NOT a single complaint with Anthony in charge .I definitely felt comfortable leaving everything in his hands, he guided me throughout the whole process and gave me different options with professionalism. We have used ONLY Becker Corp. Builders to remodeled my guest bathroom, totally gut and redo a new kitchen, and master bathroom! Anthony and his crew were very respectful, professional, clean and trustworthy! I definitely would recommend this company to all my friends, family and to anyone that is looking for a reliable contractor that does amazing work!
by deanna s on April 04, 2013
Cavaet emptor:
CAVAET EMPTOR! After working with Rockland Design/Becker Corp Builders on a recent project I can say with confidence DO NOT HIRE THIS CONTRACTOR, YOU WILL REGRET IT. Read on for the nitty-gritty details.

I engaged Rockland Design/Becker Corp Builders to do an extensive renovation on an apartment in the Bone Aire section of Suffern, New York. The project included a gut renovation of the kitchen and bathroom, as well as cosmetic work in the living-room and bedroom. The entire cost of the project excluding tile, carpet and appliances was 68K. I had three issues with Rockland Design/Becker Corp Builders 1) the poor quality of their work, 2) the delays in getting problems addressed 3) they did not honor their guarantee. Here are a few examples of my experience with Rockland Design/Becker Corp Builders:

Tile Work – About 4 months after the project was completed tiles in the dining area began loosening. As part of the project, Becker Corp installed a thin layer of concrete (mud job) on the existing subfloor before the tile was installed. Unfortunately, they never went into the basement to check if the existing subfloor could support the extra weight, and so the mud job began cracking and the tiles began coming loose. When I had another contractor inspect the loosening tile, he diagnosed the problem explaining that additional supports should have been added and that the existing ½ inch subfloor should have been replaced with ¾ inch treated plywood before the mud job was done. He told me that to fix the problem the entire kitchen would have to be removed, so the floor could be redone; estimated cost 10K to 15K. Next, I contacted Becker Corp. They told me the headers in the basement were too far apart and that this was my problem, but that they could fix it by adding a support and patching the tile. They also told me that they would do it for ‘cost.’ I decided to go with Becker Corp because I could not spend another 10K after already paying 68K. Also rather than arguing about the guarantee I agreed to pay. After the additional support was installed their tile guy came back to fix the tile, however I was told I had to pay him directly. Again rather than arguing about a guarantee I again agreed to pay. About a month after the Becker Corp repair, more tiles are coming loose on other areas of the floor and now I am now faced with tearing out a brand new kitchen so the floor can be fixed the right way. If you are reading this review, ask yourself do you really want to work with this contractor?

Plumbing – After the project was mostly complete there were leaks throughout the bathroom - the toilet, the ceiling in the shower, and from the shower doors. It took 6 weeks to get these all fixed and in the process floor insulation (which was a $400 ‘extra’) got wet and moldy, which ultimately had to all be replaced. All the leaks were simple problems that could have been avoided in the first place if the plumber had been competent. Again, ask yourself - do you want to be dealing with 6 weeks of leaks after your job is completed?

Electrical – In the process of moving the door buzzer/intercom system the electrician cut a main line disconnecting the entry system for the entire building. It took 5 weeks and 4 visits for him to finally get it fixed. Needless to say this did not put me in good standing with the condo board or my neighbors. Electrical work was done in the bedroom (recessed lighting) on which I never signed off, nevertheless I had to pay for it. Items were routinely double billed by the contractor and electrician. Wires covered in black electrical tape were left exposed in the kitchen – the work can best be described as sloppy and rushed.

I took the time to write this review in hopes of saving someone else the hassles that I went through working with this company. There are plenty of excellent contractors in Rockland County, unfortunately for me Rockland Design/Becker Corp Builders is not one of them.
by BDCasolari on February 12, 2013

Information from the business

We enjoy our work and the partnerships we share with our customers in creating the bathrooms and kitchens they have always dreamed of. By overseeing every detail and providing solutions, we ensure that remodeling is a fun and satisfying experience for everyone. Besides Additions, Basement renovation is one of the most popular way to increase living space while keeping home renovation...
by yahoolocal on February 18, 2015 from yahoolocal